The crushing line for an iron ore mine in Madagascar involves several stages to process the raw ore into smaller, manageable sizes suitable for transportation and further beneficiation. Here’s a general outline of the process:
Crushing Line Stages
1. Primary Crushing
– Equipment: Jaw Crusher or Gyratory Crusher
– Purpose: Reduce large iron ore lumps (up to 1.5m) to smaller pieces (~150-250mm).
– Location: Near the mining pit or ROM (Run-of-Mine) pad.
2. Secondary Crushing
– Equipment: Cone Crusher or Impact Crusher
– Purpose: Further reduce ore size (~50-100mm) for efficient grinding. 
3. Tertiary Crushing (if needed)
– Equipment: High-Pressure Grinding Rolls (HPGR) or Fine Cone Crushers
– Purpose: Achieve finer particle sizes (~10-30mm) before grinding.
4. Screening
– Vibrating screens separate crushed ore into different size fractions, with oversize material sent back for re-crushing.
5. (Optional) Pre-Beneficiation Steps
– Magnetic separation or dense media separation (DMS) may be used early to remove waste rock.
6. Stockpiling & Transportation
– Crushed ore is stockpiled before being transported via conveyor belts, trucks, or rail to processing plants/shipping ports.
Key Considerations for Madagascar Iron Ore Mines
- Ore Characteristics: Hematite vs. magnetite determines crushing and beneficiation methods.
- Infrastructure: Limited rail/port facilities may influence crushing plant location and logistics.
- Environmental Regulations: Dust control and water usage must comply with local laws.