Design of Gold Crushing Plant
Overview
A gold crushing plant is designed to process gold-bearing ore efficiently, maximizing recovery while minimizing operational costs. The design depends on factors like ore characteristics, production requirements, and site conditions..jpg)
Key Components
1. Primary Crushing Stage
- Equipment: Jaw crusher or gyratory crusher
- Function: Reduce large gold-bearing rocks (up to 1.5m diameter) to smaller pieces (~150-200mm)
- Considerations:
- Equipment: Cone crusher or impact crusher
- Function: Further reduce material size (~20-50mm)
- Considerations:
- Equipment: Cone crushers or high-pressure grinding rolls (HPGR)
- Function: Produce finely crushed material (~6-12mm) suitable for milling
- Vibrating screens between crushing stages
- Proper sizing ensures efficient operation of each stage
- Conveyors between units (belt conveyors typically)
- Feeders to regulate material flow
- Dust suppression systems
- Dust collection systems at transfer points
- Water spray systems where appropriate
- Noise attenuation measures near boundaries
– High capacity for initial size reduction
– Robust construction for hard rock ores
– Often includes scalping screen to remove fines before primary crushing
2. Secondary Crushing Stage
– Closed circuit with screening for better size control
– May include metal detectors/magnets to protect downstream equipment
3. Tertiary Crushing (if needed)
4. Screening System
5. Material Handling System
Design Considerations
Ore Characteristics
+ Hardness/abrasiveness affects crusher selection
+ Moisture content influences handling system design
+ Gold particle size distribution determines required final product size
Capacity Requirements
+ Throughput (TPH) determines equipment sizing
+ Must account for peak loads and future expansion
Layout Considerations
+ Minimize transfer points to reduce dust and maintenance
+ Allow adequate space for maintenance access
+ Consider topography for gravity flow where possible
Power Supply & Distribution
+ Adequate power supply for all motors + spares + future expansion
Typical Flow Diagram:
`
Run-of-Mine Ore → Scalping Screen → Primary Crusher → Secondary Crusher →
Screening → Tertiary Crusher (if needed) → Fine Ore Storage → Milling Circuit
`
Environmental Controls:
Would you like me to elaborate on any specific aspect of the gold crushing plant design?





Leave a Reply