Moving a mobile screen crusher, also known as a mobile screening plant or mobile crusher, requires careful planning and execution to ensure safety and efficiency. Here’s a step-by-step guide:
—
1. Preparation
– Inspect the Equipment: Check the mobile screen crusher for any damage, leaks, or mechanical issues before moving it.
– Secure Loose Parts: Ensure all components (e.g., conveyors, screens, and hoppers) are properly secured to prevent movement during transport.
– Check Weight and Dimensions: Confirm the weight and dimensions of the crusher to ensure it complies with local transportation regulations.
– Plan the Route: Identify the best route for transport, considering road conditions, height restrictions, and obstacles like bridges or power lines.
—
2. Transporting the Crusher
– Use Appropriate Transport Equipment: Use a heavy-duty trailer or low-loader designed to handle the weight and size of the mobile screen crusher.
– Secure the Crusher: Use chains, straps, or other securing mechanisms to firmly anchor the crusher to the trailer.
– Follow Safety Protocols: Ensure all personnel involved in the move wear appropr
e safety gear (e.g., helmets, gloves, and high-visibility vests).
—
3. Moving On-Site
– Use Built-In Mobility Features: Many mobile screen crushers have tracks or wheels for on-site movement. Engage these features carefully.
– Operate Slowly and Carefully: Move the crusher at a slow speed to avoid tipping or damaging the equipment.
– Clear the Path: Remove any obstacles or debris from the path before moving the crusher.
—
4. Setting Up at the New Location
– Level the Ground: Ensure the new site is level and stable to prevent uneven operation or accidents.
– Reassemble Components: If any parts were disassembled for transport, reassemble them according to the manufacturer’s instructions.
– Test Operation: Run a quick test to ensure everything is functioning correctly before resuming full operation.
—
5. Safety Tips
– Always follow the manufacturer’s guidelines for moving and operating the equipment.
– Avoid moving the crusher in adverse weather conditions (e.g., heavy rain or strong winds).
– Train all personnel involved in safe moving procedures.
—
If you’re unsure about any step, consult with a professional or refer to the equipment’s manual for specific instructions.




