120tph gold ore crushing line in Kazakhstan

These are two gold crushing production lines with the same configuration. The project headquarters is the Chimkent, with mines in Turkestan and Ustinka, Myanogorsk, respectively. The technological process is simple and clear. Material enters jaw crusher for primary crushing and cone crusher for secondary crushing. The final product size is about 20 mm.

The configuration of 120tph gold ore crushing line in Kazakhstan

Place of use: Kazakhstan
Equipment: PE600*900 jaw crusher, CSB160 cone crusher
Processed material: gold ore
Capacity: 120T/H
Input size: 500mm
Output size: 20mm


Posted

in

by

Tags: