To set up a crusher plant in Saudi Arabia, you need to consider several factors, including legal requirements, location, equipment selection, and operational logistics. Here’s a step-by-step guide:
1. Legal & Regulatory Requirements
– Obtain Necessary Licenses:
– Apply for an industrial license from the Saudi Ministry of Industry and Mineral Resources (MIM).
– Get environmental clearance from the General Authority for Meteorology and Environmental Protection (GAMEP).
– Secure a municipal license from the local municipality.
– Register with the Saudi Standards, Metrology, and Quality Organization (SASO) if exporting materials.
– Foreign Investment Compliance:
– If foreign-owned, ensure compliance with Saudi Arabia’s foreign investment laws (regulated by SAGIA—now part of MISA).
2. Location Selection
– Choose a site near raw material sources (quarries or mining areas).
– Ensure proximity to transportation routes (roads/ports) for easy distribution.
– Check zoning laws to confirm industrial use.
3. Equipment & Machinery
Select suitable crushers based on material type:
– Jaw Crusher – For primary crushing of hard rocks.
– Cone Crusher – For secondary/tertiary crushing.
– Impact Crusher – For softer materials like limestone.
– Vibrating Screens & Feeders – For material separation.
– Conveyor Belts – For efficient material handling.
4. Infrastructure Setup
– Construct a stable foundation for heavy machinery.
– Install power supply connections or generators for uninterrupted operations.
– Set up water supply for dust suppression systems.
5. Workforce & Safety
– Hire skilled operators, mechanics, and engineers.
– Implement safety protocols as per Saudi labor laws (OSHA-like standards).
– Provide personal protective equipment (PPE) to workers.
6. Logistics & Supply Chain
– Establish contracts with raw material suppliers (quarries).





Leave a Reply